What is the setback requirement for the absorption field of a Wisconsin mound?

  1. No setback required

  2. 3 ft

  3. 5 ft

  4. 10 ft

The correct answer is: No setback required

In the context of Wisconsin's mound soil absorption systems, the setback requirement for the absorption field is a critical aspect of ensuring proper function and protection of public health and the environment. According to the guidelines, there is no setback requirement for the absorption field itself, meaning that the absorption field can be constructed directly adjacent to property lines or other structures without a minimum distance restriction. This approach allows for greater flexibility in site design, particularly in areas where space is limited. However, it is important to always check for local amendments or additional regulations that may impose specific requirements, as these can vary by location. Overall, the absence of a setback requirement reflects the understanding that the mound system is designed to manage effluent safely, and a lack of setback does not compromise its ability to function effectively when properly installed and maintained.