Wisconsin Mound Soil Absorption System and Area FillPractice Exam

Disable ads (and more) with a membership for a one time $2.99 payment

Prepare for the Wisconsin Mound Soil Absorption System Exam. Study with comprehensive flashcards and in-depth multiple choice questions, each with detailed explanations. Elevate your knowledge and get exam-ready!

Each practice test/flash card set has 50 randomly selected questions from a bank of over 500. You'll get a new set of questions each time!

Practice this question and more.


What requirement is not necessary for the edge of the absorption field to the shoulder of the mound?

  1. Distance

  2. Elevation

  3. Material type

  4. Slope angle

The correct answer is: Distance

The requirement that is not necessary for the edge of the absorption field to the shoulder of the mound is distance. In the context of soil absorption systems, the focus is on ensuring effective treatment and absorption of wastewater rather than maintaining a specific distance between components. For absorption fields, elevation is crucial as it helps to ensure adequate drainage and gravity flow, while material type plays an important role in ensuring that the selected soil can effectively treat the effluent. Similarly, slope angle is critical for promoting proper drainage and preventing erosion or water pooling. However, there is no static requirement dictating how far the absorption field should be from the mound's shoulder; rather, it is more about maintaining the functionality of the system as a whole. Thus, distance does not have a strict requirement compared to the other factors that are essential for the proper operation of the absorption system.